题库网 (tiku.one)

 找回密码
 立即注册

手机扫一扫,访问本页面

开启左侧

IB MAI HL Geometry & Trigonometry Topic 3.1 Geometry of 3D Shapes (id: 225e15bcc

[复制链接]
admin 发表于 2024-2-5 14:14:24 | 显示全部楼层 |阅读模式
本题目来源于试卷: IB MAI HL Geometry & Trigonometry Topic 3.1 Geometry of 3D Shapes,类别为 IB数学

[填空题]
A zipline is installed on a mo:i wnbi4n b, nfv6(bom7;lj7f ux+nh)o o z0pligqksjp6v0)63 i(1crantain range as a tourist attraction. The locations of the stops along the zipline can be described by coordinates (in metres) in reference to the xx, yr a x)0pnhz3+c1lois)kpj(q0 6v6 iogy, and zz-axes, where the xx and yy axes are in the horizontal plane and zz-axis is in the vertical plane.
Stop G, at ground level, has coordinates (1000,20,0)(1000,20,0). Stop, T, located near the top of the mountain, has coordinates (10,15,550)(10,15,550).


1.Find the distance between stops G and T, rounding your answer to the nearest metre.  m
A new stop, M, is built exactly half-way between stops G and T.
2.Find the coordinates of stop M.(  ,  ,  )
3.Write down the height of stop M, in metres, above the ground.  




参考答案:
空格1: 1133±3%空格2: 505空格3: 17.5空格4: 275空格5: 275


本题详细解析:

微信扫一扫,分享更方便

帖子地址: 

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

浏览记录|使用帮助|手机版|切到手机版|题库网 (https://tiku.one)

GMT+8, 2024-12-26 04:46 , Processed in 0.058579 second(s), 28 queries , Redis On.

搜索
快速回复 返回顶部 返回列表